Two posts in one day! After the last post I glanced through the archives and saw this post about our home office. Well, we finally finished it earlier this year. I love how it turned out!
Showing posts with label Renovations. Show all posts
Showing posts with label Renovations. Show all posts
Tuesday, June 10, 2014
Sunday, July 15, 2012
Unexpected Project
A few nights ago, David and I were talking about our office, and what we could do to freshen it up. Our first thought, naturally, was paint. We contemplated many different colours, but couldn't settle on any one colour. Until David asked if we had paint in the basement. When I painted the craft/guest room when we first moved it, I bought a gallon of green paint as well as a gallon of blue paint (even though it turned out I only needed a quart of the blue). So, at 11pm we emptied out the office, I patched all the nail holes in the walls left by the previous owner, and then started cutting in. By the time I was finished it was 2am! Emily woke up at 5:30 for her feeding, and when she went back to sleep, I found myself wide awake. I tossed and turned for a little while before giving up. I figured, if I'm awake, I may as well get busy. By 11am, the main painting was done. We had to run out for some paint for the trim, and by supper time all the painting was finished.
We looked through office furniture at Ikea and finally settled on some pieces that will (eventually) work well in the room. Although, we can't afford to pick them up now, over the next few months our tiny office will have a new, organized look!
We looked through office furniture at Ikea and finally settled on some pieces that will (eventually) work well in the room. Although, we can't afford to pick them up now, over the next few months our tiny office will have a new, organized look!
| Before - the yellow was really intense... |
| After - A nice, cool, relaxing blue |
| The office furniture on our "to buy" list |
Sunday, May 13, 2012
Basement Update
Once the crew ripped up the sub-floor that they had exposed, they found that the water had stayed to one half of the basement. They set up a couple of fans and a de-humidifier (which means we now watch TV with the volume really high!) and let them run for a few days to get rid of the moisture. On Saturday, the supervisor came by to see how everything was drying out, check if the water had run any further into the basement, and to get us to choose our flooring.
| The damage so far... |
| A sample of our new flooring! |
Subscribe to:
Comments (Atom)